Cost overrun,

Definition of Cost overrun:

  1. Amount by which the actual cost exceeds the budgeted, estimated, original, or target cost.

Meaning of Cost overrun & Cost overrun Definition

Cost Overrun,

Cost Overrun Definition:

The amount at which the actual cost of a project, etc. More than the actual budget.

Literal Meanings of Cost Overrun

Cost:

Meanings of Cost:
  1. Payment (amount of money) is required before receiving or performing (an item or work).

Sentences of Cost
  1. The price of each issue of the magazine is 25 2.25

  2. Your job is to plan and calculate the cost of the media program for the campaign.

Synonyms of Cost

fare, selling price, put a value on, be valued at, charge, estimate the price of, estimate the cost of, be, rental, amount to, value, come to, be priced at, market price, levy, put a price on, evaluate, put a figure on, sell for, fetch, asking price, toll, fee, hire charge, tariff

Overrun:

Meanings of Overrun:
  1. Large distribution or occupation (one place).

  2. Exceeding the agreed or agreed time or price

  3. An example of something that exceeds a planned or agreed time or price.

  4. The movement or extension of an object beyond a specific or specific place or place.

  5. Move the car faster than the engine.

Sentences of Overrun
  1. The Mediterranean Sea was attacked by tourists

  2. Should not exceed your budget

  3. Unexpected costs increased in the program

  4. The system acts as a brake to prevent cables from leaking out

  5. The engine exceeded the fuel limit

Synonyms of Overrun

■■■■■■■■■, march into, spread over, run riot over, infest, spread like wildfire over, surge over, storm, invade, occupy, swamp, flow over, permeate, overwhelm, inundate, overgrow, swarm over, grow over

Cost Overrun,

What is The Definition of Cost Overrun?

  • The price at which the actual cost of a project, etc. More than the actual budget

Literal Meanings of Cost Overrun

Cost:

Meanings of Cost:
  1. Appreciate the price.

  2. The amount that is paid or spent to buy or receive something.

Sentences of Cost
  1. We can cover the cost of the event.

Synonyms of Cost

knock someone back, worth, set someone back, go for, damage, valuation, quotation, face value

Overrun:

Meanings of Overrun:
  1. Distribute or occupy (one place) in large quantities.

  2. This continues beyond the planned or approved time or price.

  3. Example of something other than planned or agreed time or expense.

  4. The movement or extension of an object beyond the expected or assigned position.

  5. The movement of the vehicle faster than the engine reported.

Sentences of Overrun
  1. Tourists attack the Mediterranean Sea.

  2. Let the game run for 2 minutes.

  3. An increase in expenses lowers the value of the company's shares.

  4. This system acts as a brake to prevent the cable from spreading.

  5. The engine passes the fuel block